Site Installation and Logistics Services
Secret clearance named
Posted Nov 26 · Last collected Nov 27
About this role
The Contractor shall coordinate site installation activities and perform the associated logistics duties for assigned project at authorised locations. Planning and Site Readiness
- Maintain an installation and equipment delivery plan and schedule aligned with approved project priorities.
- Coordinate installation personnel, suppliers and local representatives of the support dates, delivery appointments and required support in accordance with the approved project plan.
- Coordinate the daily sequence of on-site support with technical teams and contractors, confirming responsibilities, dependencies and access windows before activities begin.
- Prepare and follow up access requests for personnel, delivery drivers and vehicles through authorised sponsors.
- Check that equipment, accessories, work areas, delivery routes and storage space are ready before service delivery begins.
- Obtain confirmation of technical prerequisites from the responsible technical teams.
- Arrange remote technical support and provide local scheduling inputs for approved service interruptions.
- Identify delays and other constraints, coordinate corrective action and escalate unresolved issues. Shipment and Warehouse Activities
- Track shipments from dispatch through delivery and coordinate receiving arrangements with suppliers, carriers, CSSC and local representatives.
- Physically receive equipment, verify quantities against delivery documents, inspect for visible damage and retain delivery evidence.
- Record serial numbers, quantities, condition and storage locations; document discrepancies and segregate affected items where necessary.
- Store equipment in designated areas and perform picking, packing and shipping activities.
- Follow up delayed, incomplete or incorrect deliveries and coordinate authorised returns and replacements. Asset records, Preparation and Transfers
- Label equipment and maintain accurate asset, location and custody records, including assigned goods-receipt transactions through authorised systems.
- Conduct project-specific inventory checks, reconcile assets and track discrepancies and pending transactions.
- Unpack and prepare installation kits, checking required components and accessories against technical-team requirements.
- Uses real-time inventory software, with guidance, to move supplies where needed, when needed.
- Coordinate and participate in physical transfers, arranging suitable transport and handling support.
- Update equipment location and custody records following each transfer.
- Assists in maintaining NCIA CIS Assets Property Accounting Records for NCIA Entities and JFCNF within CSU AoR.
- Track equipment issued, installed, removed or returned, and coordinate authorised storage, return or disposition.
- Coordinates the retention, return or disposal of packaging in accordance with local instructions.
- Conducts detailed analysis of the Asset Management system deficiencies and provides solutions in line with existing standards to ensure operational readiness for JFCNF.
- Monitors Account Holder inventory balance lists ensuring all CIS equipment discrepancies are fully identified, investigated, documented, and reported. Also implements corrective actions in accordance with NCIA directives.
- Assists in processing Requisitions and Receiving goods through the Enterprise Business Application (EBA) system.
- Responsible for shipping and receiving equipment between CIS Sustainment Support Centre (CSSC), suppliers, distributers and stakeholders. Installation Support and Completion
- Track delivery milestones and wider schedule impacts.
- Confirm that equipment, accessories, personnel, access and work areas are ready before installation begins.
- Ensure installation teams receive the correct equipment and coordinate material flow between storage, staging and installation areas.
- Track installation progress, equipment status and outstanding support services with the technical teams.
- Maintain traceability between delivery documentation, asset records and installation locations.
- Follow up defective equipment, repairs and warranty claims using delivery records and information provided by technical personnel.
- Conduct completion walk-throughs with technical and receiving representatives, record incomplete support services and follow up corrective actions.
- Complete a final reconciliation of assigned equipment, accounting for delivered quantities and each item’s installed, removed, stored, returned or outstanding status. Reporting, Documentation and Handover
- Provide concise weekly updates and Monthly Performance and Deliverables Report covering progress, constraints, discrepancies and decisions required.
- Coordinate with stakeholders and share relevant information and knowledge throughout project delivery.
- Maintain delivery, inspection, asset, transfer and installation records in approved repositories.
- Collect and organise supporting documentation, including material data sheets, certificates of conformance, applicable TEMPEST certificates, signed installation and acceptance reports, and current user and asset lists.
- Supply verified inputs to the Project Manager and Project Support Officer for consolidated reporting.
- Compile the final handover pack, identifying outstanding actions, owners and completion dates.
- Confirm the receiving organisation and designated account holder or custodian, and obtain acknowledgement of the equipment and records handed over.
- Promptly report safety concerns, equipment losses, access failures and installation blockers.
- Provide concise lessons learned and practical improvement recommendations.
Requirements
Essential Requirements
- Higher vocational training in logistics, supply chain management, information technology, telecommunications, electrical/electronic technology, or a related discipline, combined with at least three years of relevant professional experience; or completed secondary education combined with at least five years of relevant professional experience.
- At least three years of relevant experience in site implementation, technical logistics or equipment deployment, including practical warehouse and inventory activities.
- Relevant asset-accounting, inventory-control or a recognized Project Management certification, such as Prince2 or PMP.
- Experience with Oracle Enterprise Business Applications.
- Demonstrable experience coordinating technical personnel, suppliers and local stakeholders.
- Hands-on experience receiving, inspecting, labelling, preparing and transferring equipment.
- Ability to maintain accurate asset records, schedules and progress reports.
- Fluent written and spoken English, corresponding to profile 3333.
- Working knowledge of Microsoft office applications, planning tools and inventory systems such as Service Now or Microsoft Project.
- Ability to collaborate, prioritise tasks and deliver under pressure.
- Ability to support physical duties, including lifting up to 25 lbs, subject to safe handling arrangements.
- Valid NATO SECRET clearance as from contract start date and throughout contract performance. Desirable Requirements
- Knowledge of NATO logistics procedures.
- Experience in an international military and civilian environment or at controlled-access sites.
Job Type: Contract
Industry: IT Services